RACK & STACKSTORAGE SYSTEMS

Rework The Warehouse Without Closing It

Warehouse reconfiguration that reworks an existing layout in phases — new positions, changed aisles, re-slotted stock — without closing the building.

Reconfiguration is the middle path between leaving a warehouse as it is and rebuilding it. The layout changes materially, the operation keeps running, and the building is never closed.

Request a Quote

Or call the works directly+91 97692 67792

Pallet racking rows on both sides of a warehouse aisle with a reach truck in operation

What Warehouse Reconfiguration Involves

A full reconfiguration means racking is removed, the layout is redrawn and the system is rebuilt. That is the right answer when the operation has changed fundamentally. It is rarely the only answer.

Warehouse reconfiguration is the middle path. The layout is genuinely changed — new rack rows, different aisle widths, different storage levels, a different mix of systems, more mezzanine or less floor stacking — but the work is delivered in phases against a live operation, with sections of the floor handed back in a usable state as each phase closes. The building stays open and the business keeps trading.

It suits a warehouse that has changed product mix, a site that has grown into an adjacent space, or an operation that has added a new line and now needs a different arrangement. We plan reconfiguration projects across Mumbai, Vasai-Virar, Bhiwandi, Thane, Navi Mumbai, Palghar and the wider Mumbai Metropolitan Region, and elsewhere in Maharashtra and across India.

At a glance

  • A changed layout delivered in phases against a live operation
  • New rack rows and storage levels added to the space that exists
  • Sections of the floor handed back in a usable state at the end of each phase
  • Existing racking relocated rather than scrapped wherever it is serviceable

Where warehouse reconfiguration applies

A product mix that has changed

The racking that suited the old range does not suit the new one, and re-slotting alone cannot fix it.

Growth into adjacent space

A neighbouring unit has become available and the operation has to be joined up rather than split across two sites.

A new line or a new customer

A new operation has to be accommodated without rebuilding the whole floor around it.

A layout that no longer matches the equipment

A different forklift, reach truck or trolley has changed what the aisles can take and where the racking can stand.

An expansion that has to fit around what exists

More capacity has to be added into a space that is already occupied, which is a reconfiguration rather than a new build.

Why Rack & Stack

  • The building never closes

    The work is phased against a live operation, so the business keeps trading while the layout changes.

  • Existing racking is reused where it is good

    Serviceable frames and beams are relocated rather than scrapped, which is usually the largest cost saving in the project.

  • A phasing plan before the first bolt is moved

    You know which area is affected when, and where the stock goes while it is being worked on.

  • Options with numbers behind them

    Where there is a genuine choice between layouts, each is presented with its capacity and travel figures.

  • One team for the whole programme

    Design, supply, relocation and installation are handled together, so the phases do not have to be reconciled later.

  • Covered across the MMR and beyond

    We plan and deliver reconfiguration projects across Mumbai, Bhiwandi, Thane, Vasai-Virar, Navi Mumbai, Palghar and India.

What the engagement covers

Deliverables

  • A current-state review with the specific problems identified
  • Layout options with capacity and travel figures for each
  • A phasing programme with dates, areas and stock movements
  • The rack specification for the new positions
  • Supply, installation and relocation of racking across the phases
  • Updated as-built drawings and load information at the end

What to have ready

  • What has changed in the product mix, volume or operation
  • The space available now, and any space becoming available later
  • Which areas can be released for work and for how long
  • Existing racking to be retained, relocated or replaced
  • Equipment changes, such as a different forklift or reach truck
  • Fire, access and insurance requirements that constrain the layout
  • Whether the work has to fit a fixed commercial or operational deadline

What changes the answer

Whether the new layout works within the existing column grid and clear height
Aisle width against the equipment that will work the reconfigured area
Whether existing frames can be extended or re-levelled rather than replaced
Fire clearance and escape routes through the reconfigured area
Phasing, so stock has somewhere to go while a section is being worked on
Whether the slab and the existing anchors are suitable for the new loads

Talk to us about warehouse reconfiguration

Tell us about your space, your products and how you work today. If drawings exist, send those; if they do not, the site survey comes first and the plan follows it.

Phone+91 97692 67792
+91 81698 26744
Emailinfo@rackandstack.in
Works and officeSr. No. 94/1, Umar Compound, Sopara Phata, Vasai-Virar, Maharashtra 401208
Working hoursMonday–Friday, 9:00 AM–6:00 PM

How the work runs

Review of the current layout

We establish how the floor works today and what the change is meant to achieve, in measurable terms.

Options and phasing plan

Layout options are prepared with a phasing plan, showing what is done when and which areas are affected.

Design and approvals

The layout, the rack specification and the phasing programme are agreed before anything is dismantled.

Phase 1: make good and relocate

The first area is cleared, existing racking is relocated or removed, and new positions are installed.

Phase 2 onwards: roll the change through

Each subsequent area is reconfigured in the same way, with stock moved across as the phases progress.

Final check and handover

The completed layout is checked as a whole, the drawings are updated and the operation is handed over.

Industries and coverage

Mumbai & Maharashtra

Other industrial markets

  • Ahmedabad
  • Surat
  • Vadodara
  • Delhi NCR
  • Noida
  • Gurugram
  • Faridabad
  • Bengaluru
  • Chennai
  • Hyderabad

Frequently asked questions

What is the difference between reconfiguration and a new installation?

A new installation starts from an empty floor and builds the layout from scratch. A reconfiguration changes an existing layout, usually in phases, keeping some existing racking, some existing stock positions and most of the operation running while it happens.

What do you need to prepare a quote?

Share any dimensions you have, item or pallet sizes, maximum loads, quantities, how often you access them, your handling equipment and any building limits. A site survey can help fill the gaps.

Can you reconfigure a warehouse without closing it?

Yes. That is the normal case. The work is split into phases, each area is released for the works and handed back in a usable state, and stock is moved across as the phases progress.

Can you set up a system in an existing warehouse?

Yes. We review your columns, clear height, doors, services, movement paths and current operations before proposing a layout.

How long does a reconfiguration programme take?

It depends on the size of the change and how much of the floor can be released at a time. The programme is set out phase by phase with dates and areas, so you can plan around it rather than being given a single duration.

How do you calculate storage capacity?

Capacity depends on item size, declared loads, system type, aisle space, handling equipment and the usable building area. We calculate it from your specific inputs.

Do you handle installation?

Yes. Installation is included as part of the agreed project scope. We check site readiness before scheduling.

Do we have to remove all our existing racking?

Usually not. Serviceable frames and beams are relocated into the new layout wherever they are suitable, which is normally the largest single saving in the project. Components that are damaged or unsuitable are replaced.

Can you add capacity without moving what is already there?

It depends on the shape of the space and the existing layout. Adding a run into an open area is straightforward; adding into a space bounded by existing rows may require the adjacent rows to be reworked. The layout options make that trade-off clear before anything is committed.

How do you handle stock during the works?

Each phase includes a stock movement plan, and the areas being worked on are cleared and restocked as each phase closes. Where stock has to be held temporarily, that is identified in the programme rather than left for the operation to absorb.

Do you reconfigure warehouses in Bhiwandi, Vasai-Virar and Thane?

Yes. We plan and deliver reconfiguration projects across Mumbai, Vasai-Virar, Bhiwandi, Thane, Navi Mumbai, Palghar and the wider Mumbai Metropolitan Region, and for industrial sites elsewhere in Maharashtra and across India.

Can you reconfigure an office or a records store rather than a warehouse?

Yes, though the approach differs. Office and records storage uses compactors, mobile shelving and filing systems, and the reconfiguration is planned around access, security and confidentiality rather than aisles and forklifts.