Long pick paths
Operators walk the length of the building for stock that is stored at the far end, whether by accident or because the layout was never changed.
Warehouse layout planning that places rack rows, aisles, staging and travel paths so the space works at the speed your operation actually runs.
Most warehouse problems are movement problems. The stock is in the right place and the racking is fine, but the aisles are in the wrong order and the pick path doubles back on itself.
Or call the works directly+91 97692 67792

Systems this work specifies
Conventional Pallet Racking SystemHeavy Duty Pallet RackingMulti Tier Racking SystemWarehouse layout planning is the arrangement of the whole floor, not just the racking. It decides where the rack rows go, how wide the aisles are, where goods are received and staged for put-away, where picking starts and finishes, and how people, forklifts and pedestrians move through the space without meeting each other.
A layout that treats storage as the only variable produces a warehouse where every pick is a long walk and every goods-in vehicle blocks an aisle. A planned layout treats travel distance as a cost: it puts fast-moving stock close to the dispatch point, reserves space for staging near the doors, and keeps pedestrian routes separate from powered equipment routes. The result is a floor that can absorb more volume without adding more square metres.
We prepare layout plans for warehouses, factories and distribution centres across Mumbai, Vasai-Virar, Bhiwandi, Thane, Navi Mumbai, Palghar and across India, whether the project is a new warehouse, a re-layout of an existing one, or an expansion into space that is already in use.
Operators walk the length of the building for stock that is stored at the far end, whether by accident or because the layout was never changed.
Staging happens wherever there is space, so trolleys and pallets end up in the aisles that are supposed to be clear.
Without a planned route, walking and driving occupy the same space, which is a safety exposure as much as an efficiency one.
The floor is full but a large part of it is circulation, and the circulation is not where it needs to be.
New racking has to go in around an operating warehouse, which needs a phased plan rather than a drawing.
The layout is measured by how far people and equipment move, not only by how many positions fit on the floor.
Where there is a genuine trade-off, more than one layout is presented with its capacity and travel figures, so the decision stays with you.
The people who pick, receive and dispatch review the plan, because they hold the practical knowledge the data does not.
In a running warehouse the layout is phased so that each stage keeps the operation working.
Reserve zones are identified in the drawing, so the next stage of bays is added rather than reworked.
The drawing pack is produced for the site, not as a concept image, so it can be marked up and worked from.
Tell us about your space, your products and how you work today. If drawings exist, send those; if they do not, the site survey comes first and the plan follows it.
We look at how the floor works today and, where the numbers exist, at how much travel and how much delay the current arrangement costs.
Goods-in, put-away, picking, replenishment and dispatch are mapped as separate flows with their own volumes.
Two or three arrangements are developed, each with its own capacity and travel figures, so the trade-off is visible.
The options are walked through with the team who run the floor, because they know the constraints the data does not show.
The chosen layout is issued as a scaled drawing set with rack positions, aisle widths, staging areas and marked routes.

Conventional pallet racking system for selective pallet storage, allowing direct access to every pallet and efficient use of warehouse space with standard material-handling equipment.

Engineered for high-load industrial warehousing, our heavy-duty pallet racks provide structural stability for unitized pallet loads. Constructed with high-strength upright frames, braced channels, and adjustable box or step beams, these systems integrate seamlessly with standard timber, plastic, and steel pallets.

Multiply your vertical picking space without expanding your building footprint. Our multi-tier rack systems utilize rack-supported walkways, staircases, and safety handrails to create multiple manual picking levels within high-ceiling warehouses.

Unlock unused overhead headroom by adding a structural steel intermediate floor. Our free-standing and rack-supported mezzanine rack systems create additional floor area for storage, assembly lines, packing stations, or in-plant offices.

Cantilever racking system for safe, organised storage of long, bulky and irregular items like pipes, sections, panels and timber, with open front access.
Mumbai & Maharashtra
Other industrial markets
A scaled layout showing rack rows and positions, aisle widths, goods-in and dispatch staging, cross-aisles, pedestrian walkways and reserve zones for expansion. Where there is more than one sensible arrangement, the alternatives are shown with their capacity and travel figures so they can be compared.
Share any dimensions you have, item or pallet sizes, maximum loads, quantities, how often you access them, your handling equipment and any building limits. A site survey can help fill the gaps.
Racking design decides what each rack is made of and what it can carry. Layout planning decides where everything sits and how people and equipment move between it. A layout plan is normally produced first or alongside the racking design, because the layout determines the racking.
Yes. We review your columns, clear height, doors, services, movement paths and current operations before proposing a layout.
Yes, and it is one of the most common requests. The work is phased so that each stage keeps the operation running, and the existing racking that works is left in place while the areas that cause the friction are changed first.
Capacity depends on item size, declared loads, system type, aisle space, handling equipment and the usable building area. We calculate it from your specific inputs.
Yes. Installation is included as part of the agreed project scope. We check site readiness before scheduling.
From the storage position count, which comes from the pallet sizes and the number of levels available under the clear height, and from the circulation the operation needs: aisles, cross-aisles, staging areas and pedestrian routes. That gives a required area, which you compare with the available area.
Yes. We prepare layout plans across the Mumbai Metropolitan Region, including Mumbai, Vasai-Virar, Bhiwandi, Thane, Navi Mumbai and Palghar, and for industrial sites elsewhere in Maharashtra and across India.
Yes. Separating walking routes from powered equipment is one of the changes that improves both safety and flow, and it is drawn into the issued plan so the routes can be marked on the floor as shown.
The layout defines the racking positions: where the rows are, how deep they are, how many levels and what the beam spans are. Full section details and load ratings are covered in the racking design, which is produced alongside it.
Yes. Where a system is already installed, the plan marks what is retained, what is relocated and what is removed, with the sequence for each phase.