One Programme, One Set Of Drawings, One Point Of Contact

Project support for multi-stage storage work: coordination between the layout, the structural design, the site and the installation crew.

A storage project rarely involves only one discipline. Project support is the coordination that keeps the drawing, the structure, the equipment and the site working to the same plan.

Request a Quote

Or call the works directly+91 97692 67792

Site engineer checking rack installation drawings on a warehouse floor

What Project Support Covers

Storage work grows. What starts as a rack supply becomes a layout review, then a structural check, then a builder's work, then a fire clearance, then an inspection, then an installation date that has to work with the rest of the programme. Each of those steps has its own document, its own lead time and its own way of failing.

Project support is the coordination that holds that together. We act as the single point of contact for the whole programme: the party that holds the current drawing, chases the approvals, confirms that the site is ready, sequences the work, and makes sure that what is installed matches what was approved.

It matters most on larger and longer projects, and on any job where the racking has to work with something else — a mezzanine built by a civil contractor, a sprinkler system installed by a specialist, a dock leveller package, or a building that needs a fire assessment. We support projects across Mumbai, Vasai-Virar, Bhiwandi, Thane, Navi Mumbai, Palghar and the wider Mumbai Metropolitan Region, and elsewhere in Maharashtra and across India.

At a glance

  • A single point of contact holding the current drawing and the open actions
  • Coordination between the racking, the structure, the services and the site
  • Programme, sequencing and site-readiness checks before work starts
  • One party responsible for the handover of a completed installation

Where project support applies

A multi-discipline site

Civil work, structural steel, fire systems and racking all have to arrive in the right order on the same floor.

A project with a fixed deadline

When a date cannot move, the coordination that protects it has to be somebody's explicit job.

Racking that interfaces with a structure

A mezzanine, a canopy or a raised platform has to connect to the racking, and the drawings have to agree.

A phased rollout across several sites

Rolling a new layout out to more than one site means the standard has to be the same at each of them.

A client or contractor without in-house storage expertise

Someone has to be able to judge whether a racking proposal is right, and that is a specific skill.

Why Rack & Stack

  • One party coordinating everything

    The racking supplier, the installer and the designer are not left to reconcile the drawings with each other.

  • Hold points in the programme

    Approvals, readiness checks and inspections are scheduled as part of the programme rather than discovered on the day.

  • Built around a live site

    The programme reflects the other trades and the operating schedule, so it is a plan that can be worked to.

  • One set of current drawings

    Everyone works from the same issue, which removes the single most common cause of site delay on storage projects.

  • Open items tracked to closure

    Outstanding actions are listed, owned and dated, so nothing sits unresolved between two contractors.

  • Accountable through handover

    The same team that coordinated the works is there at handover, when the final checks are done.

What the engagement covers

Deliverables

  • A single scope and responsibility matrix for the project
  • A coordinated drawing set issued to every party
  • A dated programme with hold points and readiness checks
  • An open-actions register that everyone works from
  • Site readiness and workmanship checks during the works
  • A coordinated handover pack with the drawings and load information

What to have ready

  • The scope of the work and who else is involved in the site
  • The programme dates that are fixed and cannot move
  • Whether a structural or fire assessment is required
  • Whether other trades are working in the same area and when
  • Who signs off on the final layout and the safety documentation
  • Site access, delivery windows and crane or material handling arrangements
  • Whether the business needs the area back in use by a specific date

What changes the answer

Interface with structural columns, slabs and foundations
Fire protection, sprinkler layout and the required clearances
Electrical, lighting and data routing around and through the racking
Access for maintenance, inspection and emergency evacuation
The order of work between different trades on the same floor
Hold points in the programme, such as approvals and readiness checks

Talk to us about project support

Tell us about your space, your products and how you work today. If drawings exist, send those; if they do not, the site survey comes first and the plan follows it.

Phone+91 97692 67792
+91 81698 26744
Emailinfo@rackandstack.in
Works and officeSr. No. 94/1, Umar Compound, Sopara Phata, Vasai-Virar, Maharashtra 401208
Working hoursMonday–Friday, 9:00 AM–6:00 PM

How the work runs

Kick-off and scope review

The scope, the parties involved, the constraints and the fixed dates are established in one place.

Design coordination

The racking layout is coordinated with the structure, the services and the other trades, and the issues are closed out.

Approvals and documentation

Drawings, calculations and safety information are prepared for the approvals the site requires.

Programme and readiness

A dated programme is issued, with hold points and site-readiness checks built into it.

Execution oversight

We stay involved during the works, checking that what is being built matches the approved drawing.

Handover and close-out

The completed work is handed over with the drawings, the load information and the outstanding items listed.

Industries and coverage

Mumbai & Maharashtra

  • Mumbai
  • Vasai-Virar
  • Bhiwandi
  • Thane
  • Navi Mumbai
  • Palghar
  • Pune
  • Chakan
  • Nashik
  • Aurangabad

Other industrial markets

  • Ahmedabad
  • Surat
  • Vadodara
  • Delhi NCR
  • Noida
  • Gurugram
  • Faridabad
  • Bengaluru
  • Chennai
  • Hyderabad

Frequently asked questions

What does project support mean for a storage project?

It means one party is responsible for coordinating the whole programme rather than each contractor coordinating their own scope. In practice that covers the drawing set, the sequence of work, the approvals, the site-readiness checks and the handover, with a single point of contact throughout.

What do you need to prepare a quote?

Share any dimensions you have, item or pallet sizes, maximum loads, quantities, how often you access them, your handling equipment and any building limits. A site survey can help fill the gaps.

Do we need project support for a small installation?

Usually not. A single straightforward rack installation in an empty space is managed without it. It becomes valuable when the work is phased, when several trades are involved, or when the racking has to interface with a structure, a mezzanine or a fire system.

Can you set up a system in an existing warehouse?

Yes. We review your columns, clear height, doors, services, movement paths and current operations before proposing a layout.

Can you work with our own main contractor?

Yes, and that is a common arrangement. We work within the programme and the site rules set by the main contractor, and we coordinate the racking scope with the other trades. Where it is simpler, we can act as the main contractor for the storage scope.

How do you calculate storage capacity?

Capacity depends on item size, declared loads, system type, aisle space, handling equipment and the usable building area. We calculate it from your specific inputs.

Do you handle installation?

Yes. Installation is included as part of the agreed project scope. We check site readiness before scheduling.

Who do we deal with during the project?

One project contact, supported by the design and site teams behind them. You get a named person for the programme, a written action list, and a single place to raise anything that needs a decision.

Do you handle fire and structural approvals?

We prepare the documentation the site needs — drawings, load information and safety information — and coordinate with the party that carries out the assessment. The approval itself has to come from the relevant authority or the client's appointed engineer, and we support that process rather than issue it.

Can you support a rollout across several warehouses?

Yes. A multi-site rollout is run against one standard, with the same layout, the same specification and the same handover standard at each site, and a programme that sequences the sites so the business is never without capacity.

Do you support projects outside the Mumbai region?

Yes. We support storage projects across Mumbai, Vasai-Virar, Bhiwandi, Thane, Navi Mumbai, Palghar and the wider Mumbai Metropolitan Region, and on industrial projects elsewhere in Maharashtra and across India.

How do you keep a programme on track when another trade delays?

The programme carries hold points and an open-actions register, so a delay is visible early and either absorbed or escalated with a decision attached. The alternative, discovering it on the installation day, is what this coordination exists to prevent.