Rack Supply and Installation, From One Team

Rack supply and installation by the team that manufactures it: delivered, assembled, anchored and handed over ready for use, across Mumbai and India.

Racks that arrive on site and never get assembled properly are the most common fault in the industry. Supply and installation from one team removes that gap.

Request a Quote

Or call the works directly+91 97692 67792

Newly installed blue and orange pallet racking rows in a warehouse

What Rack Supply and Installation Covers

Rack supply and installation is the delivery of the racking, the assembly of the frames and beams, the fixing of decking and accessories, the anchoring of the frames to the floor, and the handover of a system that is safe to load and ready to work.

Because Rack & Stack manufactures its own racking, the people fitting it are the people who made it. That matters in three practical ways. The specification on the drawing is the specification that arrives. Damaged or wrong components are replaced at the factory rather than improvised on site. And when a question comes up during installation, the answer comes from the people who designed and made the system rather than from a third party.

We install throughout Mumbai, Vasai-Virar, Bhiwandi, Thane, Navi Mumbai, Palghar and the wider Mumbai Metropolitan Region, and on industrial projects elsewhere in Maharashtra and across India. Installation is included as part of the agreed project scope, and the site is checked for readiness before the crew is scheduled.

At a glance

  • Manufactured in-house, so what is specified is what is delivered
  • Assembled, anchored and checked by the same team that made the system
  • Anchoring and protection included as part of the scope
  • Site readiness checked before the installation crew is scheduled

Where rack supply & installation applies

A new warehouse going live

The racking has to be in place and safe before stock arrives, on a date the business is depending on.

Replacing racking that is no longer fit for purpose

Old systems with the wrong capacity or configuration are removed and replaced, often in a working building.

Extending an existing installation

New bays are added to the ends of existing rows so the layout grows without dismantling what is already working.

Installation on a tight schedule

Phased delivery and installation, with the site handed back in a usable state at the end of each shift.

A site that cannot be closed for the works

Storage areas stay in use throughout, so the sequence is planned around the operation rather than the other way round.

Why Rack & Stack

  • Manufactured and installed by one company

    There is no gap between the factory and the site floor, so a problem is fixed by the people who caused it.

  • Anchoring included

    Floor anchoring and upright protection are part of the installation scope rather than an optional extra that appears on the invoice.

  • Sequenced for a live site

    Where the warehouse keeps running, the build order and material sequence are planned so the operation keeps working.

  • Checked before handover

    Alignment, anchoring, beam level and load signage are verified before the system is handed over for use.

  • Your team is trained on it

    A walk-through at handover covers safe loading, what the levels are rated for and what must not be stored on them.

  • Covered across the MMR and India

    Installation crews work across Mumbai, Bhiwandi, Thane, Vasai-Virar, Navi Mumbai, Palghar and further afield.

What the engagement covers

Deliverables

  • Manufactured racking delivered to the agreed sequence
  • Erection, anchoring, decking and accessory installation by our own crew
  • Upright protection and column guards where the layout requires them
  • Load signage and the safe working load information for each level
  • A site copy of the as-installed layout drawing
  • Handover documentation and a walk-through with your team

What to have ready

  • Confirmed drawing, rack specification and item list
  • Delivery route, crane access and unloading arrangements on site
  • Floor readiness and the anchor positions to be used
  • Working hours and whether the area must be handed back each night
  • Mechanical handling equipment available on site
  • Number of phases if the installation has to run alongside operations

What changes the answer

Frame anchoring, and whether the slab allows mechanical fixing
Frame plumbness and beam level, checked as the rows are built
Row spacing against the equipment that works the aisle
Upright protection at aisle ends and traffic routes
Load beam connectors, and the pitch the levels are set at
Fire protection and column guards where racks sit close to structure

Talk to us about rack supply & installation

Tell us about your space, your products and how you work today. If drawings exist, send those; if they do not, the site survey comes first and the plan follows it.

Phone+91 97692 67792
+91 81698 26744
Emailinfo@rackandstack.in
Works and officeSr. No. 94/1, Umar Compound, Sopara Phata, Vasai-Virar, Maharashtra 401208
Working hoursMonday–Friday, 9:00 AM–6:00 PM

How the work runs

Approved drawings and item list

Manufacture starts only after the layout and the rack specification have been approved by you in writing.

Material preparation

Frames, beams, decking and accessories are cut, formed, painted and checked against the approved item list.

Delivery to site

Material is delivered in a sequence that matches the build order, so the floor is not blocked with more steel than it can take.

Assembly and anchoring

Frames are erected, levelled and anchored, beams and decking are fitted, and accessories are installed.

Inspection and safety handover

Alignment, anchoring, beam level and load signage are checked, and the installation is handed over with the safety information you need.

Training and close-out

Your team is shown how to use the system safely, and the drawing and load information is issued for the site records.

Industries and coverage

Mumbai & Maharashtra

  • Mumbai
  • Vasai-Virar
  • Bhiwandi
  • Thane
  • Navi Mumbai
  • Palghar
  • Pune
  • Chakan
  • Nashik
  • Aurangabad

Other industrial markets

  • Ahmedabad
  • Surat
  • Vadodara
  • Delhi NCR
  • Noida
  • Gurugram
  • Faridabad
  • Bengaluru
  • Chennai
  • Hyderabad

Frequently asked questions

Is installation included in the racking price?

Installation is part of the agreed project scope, along with delivery, assembly, anchoring and the safety information you need at handover. If your site needs something outside that scope, such as night working or a phased handover across several shifts, it is identified and priced before the order is placed.

What do you need to prepare a quote?

Share any dimensions you have, item or pallet sizes, maximum loads, quantities, how often you access them, your handling equipment and any building limits. A site survey can help fill the gaps.

How long does a warehouse racking installation take?

It depends on the size of the installation, the number of rows and the access to the site. A phased installation across a live warehouse takes longer than the same quantity of racking installed in an empty building. The schedule is agreed with you before the crew is scheduled.

Can you set up a system in an existing warehouse?

Yes. We review your columns, clear height, doors, services, movement paths and current operations before proposing a layout.

Can you install racking in a warehouse that is still operating?

Yes. The build order and the delivery sequence are planned around the operation, areas are handed back in a usable state at the end of each shift, and the site is surveyed for readiness before the crew arrives.

How do you calculate storage capacity?

Capacity depends on item size, declared loads, system type, aisle space, handling equipment and the usable building area. We calculate it from your specific inputs.

Do you handle installation?

Yes. Installation is included as part of the agreed project scope. We check site readiness before scheduling.

Do you anchor the racking to the floor?

Yes, floor anchoring is included in the installation scope, along with upright protection at the ends of the rows and at traffic routes. The anchor type is chosen against the slab and the load, and is confirmed during the survey.

What if a beam or frame is damaged during delivery?

It is replaced. Because we manufacture the racking ourselves, a damaged component is made again at the factory rather than improvised on site, and the item is checked against the approved list before the row is closed up.

Do you install racking in Bhiwandi, Vasai-Virar and Thane?

Yes. Installation crews work across Mumbai, Vasai-Virar, Bhiwandi, Thane, Navi Mumbai, Palghar and the wider Mumbai Metropolitan Region, and on industrial projects elsewhere in Maharashtra and across India.

What is handed over at the end of the installation?

A site copy of the as-installed layout, the safe working load information and load signage for each level, and a walk-through with your team covering safe loading and the limits of the system. Any outstanding items are listed in writing.

Can you install racking we have bought elsewhere?

We do install customer-supplied racking where the system is one we manufacture and can stand behind, and where the design has been checked against our specification. Where it is not, we will say so rather than take on a system we cannot support.