A new warehouse going live
The racking has to be in place and safe before stock arrives, on a date the business is depending on.
Rack supply and installation by the team that manufactures it: delivered, assembled, anchored and handed over ready for use, across Mumbai and India.
Racks that arrive on site and never get assembled properly are the most common fault in the industry. Supply and installation from one team removes that gap.
Or call the works directly+91 97692 67792

Systems this work specifies
Heavy Duty Pallet RackingConventional Pallet Racking SystemHeavy Duty Long Span RacksRack supply and installation is the delivery of the racking, the assembly of the frames and beams, the fixing of decking and accessories, the anchoring of the frames to the floor, and the handover of a system that is safe to load and ready to work.
Because Rack & Stack manufactures its own racking, the people fitting it are the people who made it. That matters in three practical ways. The specification on the drawing is the specification that arrives. Damaged or wrong components are replaced at the factory rather than improvised on site. And when a question comes up during installation, the answer comes from the people who designed and made the system rather than from a third party.
We install throughout Mumbai, Vasai-Virar, Bhiwandi, Thane, Navi Mumbai, Palghar and the wider Mumbai Metropolitan Region, and on industrial projects elsewhere in Maharashtra and across India. Installation is included as part of the agreed project scope, and the site is checked for readiness before the crew is scheduled.
The racking has to be in place and safe before stock arrives, on a date the business is depending on.
Old systems with the wrong capacity or configuration are removed and replaced, often in a working building.
New bays are added to the ends of existing rows so the layout grows without dismantling what is already working.
Phased delivery and installation, with the site handed back in a usable state at the end of each shift.
Storage areas stay in use throughout, so the sequence is planned around the operation rather than the other way round.
There is no gap between the factory and the site floor, so a problem is fixed by the people who caused it.
Floor anchoring and upright protection are part of the installation scope rather than an optional extra that appears on the invoice.
Where the warehouse keeps running, the build order and material sequence are planned so the operation keeps working.
Alignment, anchoring, beam level and load signage are verified before the system is handed over for use.
A walk-through at handover covers safe loading, what the levels are rated for and what must not be stored on them.
Installation crews work across Mumbai, Bhiwandi, Thane, Vasai-Virar, Navi Mumbai, Palghar and further afield.
Tell us about your space, your products and how you work today. If drawings exist, send those; if they do not, the site survey comes first and the plan follows it.
Manufacture starts only after the layout and the rack specification have been approved by you in writing.
Frames, beams, decking and accessories are cut, formed, painted and checked against the approved item list.
Material is delivered in a sequence that matches the build order, so the floor is not blocked with more steel than it can take.
Frames are erected, levelled and anchored, beams and decking are fitted, and accessories are installed.
Alignment, anchoring, beam level and load signage are checked, and the installation is handed over with the safety information you need.
Your team is shown how to use the system safely, and the drawing and load information is issued for the site records.

Engineered for high-load industrial warehousing, our heavy-duty pallet racks provide structural stability for unitized pallet loads. Constructed with high-strength upright frames, braced channels, and adjustable box or step beams, these systems integrate seamlessly with standard timber, plastic, and steel pallets.

Conventional pallet racking system for selective pallet storage, allowing direct access to every pallet and efficient use of warehouse space with standard material-handling equipment.

Bridging the gap between light-duty slotted angle racks and heavy-duty pallet racking, long span shelving offers wide, unobstructed shelf bays for manually loaded bulky cartons, totes, and medium-weight containers.

Medium duty shelving racks for organised storage of cartons, spares and consumables, offering higher strength than light office shelving for industrial and commercial use.

Cantilever racking system for safe, organised storage of long, bulky and irregular items like pipes, sections, panels and timber, with open front access.
Installation is part of the agreed project scope, along with delivery, assembly, anchoring and the safety information you need at handover. If your site needs something outside that scope, such as night working or a phased handover across several shifts, it is identified and priced before the order is placed.
Share any dimensions you have, item or pallet sizes, maximum loads, quantities, how often you access them, your handling equipment and any building limits. A site survey can help fill the gaps.
It depends on the size of the installation, the number of rows and the access to the site. A phased installation across a live warehouse takes longer than the same quantity of racking installed in an empty building. The schedule is agreed with you before the crew is scheduled.
Yes. We review your columns, clear height, doors, services, movement paths and current operations before proposing a layout.
Yes. The build order and the delivery sequence are planned around the operation, areas are handed back in a usable state at the end of each shift, and the site is surveyed for readiness before the crew arrives.
Capacity depends on item size, declared loads, system type, aisle space, handling equipment and the usable building area. We calculate it from your specific inputs.
Yes. Installation is included as part of the agreed project scope. We check site readiness before scheduling.
Yes, floor anchoring is included in the installation scope, along with upright protection at the ends of the rows and at traffic routes. The anchor type is chosen against the slab and the load, and is confirmed during the survey.
It is replaced. Because we manufacture the racking ourselves, a damaged component is made again at the factory rather than improvised on site, and the item is checked against the approved list before the row is closed up.
Yes. Installation crews work across Mumbai, Vasai-Virar, Bhiwandi, Thane, Navi Mumbai, Palghar and the wider Mumbai Metropolitan Region, and on industrial projects elsewhere in Maharashtra and across India.
A site copy of the as-installed layout, the safe working load information and load signage for each level, and a walk-through with your team covering safe loading and the limits of the system. Any outstanding items are listed in writing.
We do install customer-supplied racking where the system is one we manufacture and can stand behind, and where the design has been checked against our specification. Where it is not, we will say so rather than take on a system we cannot support.