There is no reliable drawing, so the layout has to start from what is physically in the building.
A measured survey of your warehouse: dimensions, columns, doors, services, floor and handling equipment, recorded for a reliable racking design.
A racking design is only as good as the survey behind it. A site survey records the building as it is — not as it was drawn years ago — so the layout is built on facts.
Or call the works directly+91 97692 67792

Systems this work specifies
Heavy Duty Pallet RackingConventional Pallet Racking SystemHeavy Duty Long Span RacksA site survey is a measured visit to your warehouse. Our team records the building as it actually is: internal dimensions, column positions and spacing, door and roller-shutter sizes, roof height, the position of sprinklers, lighting and cable trays, the condition of the floor, and the handling equipment that works the space.
It matters because warehouse drawings are rarely a substitute for being there. A building can have been extended, a column can have been added, the fire system can have been changed, and the clear height under the trusses is often lower than the height on the drawing. Every one of those changes the answer. A survey takes the guesswork out before a single section of steel is ordered.
We carry out site surveys across Mumbai, Vasai-Virar, Bhiwandi, Thane, Navi Mumbai, Palghar and the wider Mumbai Metropolitan Region, and for industrial sites elsewhere in Maharashtra and across India. The output is a measured drawing and a written report that your design team can work from.
There is no reliable drawing, so the layout has to start from what is physically in the building.
New bays have to line up with the racking already standing, which means measuring the existing system first.
The condition and dimensions of the system being removed determine whether the new one can be identical or better.
A working site has to be surveyed around the operation, at a time that does not stop it.
When delivered capacity is not what was planned for, an independent measurement is the fastest way to establish what happened.
Every figure in the report comes from the site, so the design is not built on a drawing that may be years out of date.
The report is illustrated, which makes it easy to agree a point with a supplier or an auditor without a second visit.
We plan the visit around your dispatch and picking schedule so the survey does not cost you a shift.
Sprinklers, lighting, cable trays and ducting are recorded, because these decide where a rack can stand and how high it can go.
The survey output is structured the way the design team needs it, so nothing is lost or re-measured.
Survey visits are arranged across Mumbai, Bhiwandi, Thane, Vasai-Virar, Navi Mumbai, Palghar and wider Maharashtra.
Tell us about your space, your products and how you work today. If drawings exist, send those; if they do not, the site survey comes first and the plan follows it.
We agree what needs to be measured and arrange a visit time that does not interrupt picking or dispatch.
Dimensions, column grid, openings, services and equipment are recorded, and the building is photographed.
Where racking is already in place, its condition, alignment and anchoring are noted.
You receive a measured drawing and a written report with photographs and a list of open points.
The survey data is handed to the design team, who confirm that it is enough to proceed or ask for the outstanding measurements.

Engineered for high-load industrial warehousing, our heavy-duty pallet racks provide structural stability for unitized pallet loads. Constructed with high-strength upright frames, braced channels, and adjustable box or step beams, these systems integrate seamlessly with standard timber, plastic, and steel pallets.

Conventional pallet racking system for selective pallet storage, allowing direct access to every pallet and efficient use of warehouse space with standard material-handling equipment.

Bridging the gap between light-duty slotted angle racks and heavy-duty pallet racking, long span shelving offers wide, unobstructed shelf bays for manually loaded bulky cartons, totes, and medium-weight containers.

Multiply your vertical picking space without expanding your building footprint. Our multi-tier rack systems utilize rack-supported walkways, staircases, and safety handrails to create multiple manual picking levels within high-ceiling warehouses.
Mumbai & Maharashtra
Other industrial markets
It includes measured internal dimensions, the column grid and spacing, door and shutter openings, clear height below trusses and services, the position of sprinklers, lighting and other overhead services, floor condition, and the handling equipment working the space. The result is a scaled drawing and a written report with photographs.
Share any dimensions you have, item or pallet sizes, maximum loads, quantities, how often you access them, your handling equipment and any building limits. A site survey can help fill the gaps.
A single warehouse survey is usually a short visit on site, plus the time to produce the drawing and report. Larger sites or sites with several buildings take longer. The schedule is agreed before the visit rather than promised afterwards.
Yes. We review your columns, clear height, doors, services, movement paths and current operations before proposing a layout.
It is worth having one. Drawings are often out of date, rarely show the clear height under services, and never show what has been built since. If your drawings are recent, detailed and match the building, a survey can be scoped more narrowly to check the points that matter.
Capacity depends on item size, declared loads, system type, aisle space, handling equipment and the usable building area. We calculate it from your specific inputs.
Yes. Installation is included as part of the agreed project scope. We check site readiness before scheduling.
No. Surveys are planned around your dispatch and picking schedule, and the team works to an agreed access route so that aisles stay usable for as long as possible.
Yes. We arrange survey visits across Mumbai, Vasai-Virar, Bhiwandi, Thane, Navi Mumbai, Palghar and the rest of the Mumbai Metropolitan Region, and for industrial sites elsewhere in Maharashtra and across India.
The survey is a separate service with its own scope, because the work and the report are real and take time on site. In many projects it is the first step, and the cost is recovered many times over by removing the risk of an incorrect design.
They are written into the report with photographs, including anything that affects the racking such as floor damage, low beams, missing fire clearances or an unsuitable column layout. Where an alternative approach is possible, we note it and its cost implications.
Yes. A pre-relocation survey records the system as it stands, which is what allows a like-for-like re-erection in the new location and gives you a record of the condition of the racking before it is dismantled.