Before a major capital commitment
A specification written before the quotes are invited is the cheapest way to get comparable proposals.
Independent storage consulting for warehouses and factories: audit the current arrangement, specify the right system and hold us to it.
Consulting is for the client who wants a specification and an opinion rather than a quotation. It is also the service that keeps a supplier honest.
Or call the works directly+91 97692 67792

Systems this work specifies
Heavy Duty Pallet RackingConventional Pallet Racking SystemHeavy Duty Long Span RacksStorage consulting is for organisations that want an independent assessment of what their storage should be, written down clearly enough to act on. It is used when a business is about to make a significant capital commitment, when an existing supplier's proposal needs checking, when the requirement has changed and nobody is sure what to do about it, or when an in-house team wants a specification to go out to tender against.
The work is deliberately not tied to supplying equipment. A consulting engagement ends with a written specification, a layout, a schedule of requirements and a set of notes on the options — including, where relevant, an assessment of what your current supplier has proposed. If the answer is that a third-party product is the right one, that is a legitimate finding.
Rack & Stack provides industrial storage consulting across Mumbai, Vasai-Virar, Bhiwandi, Thane, Navi Mumbai, Palghar and the wider Mumbai Metropolitan Region, and for organisations elsewhere in Maharashtra and across India.
A specification written before the quotes are invited is the cheapest way to get comparable proposals.
An independent read of the drawings and the assumptions is often the difference between a good proposal and an expensive one.
Product mix, volumes or the building have moved on and nobody is sure whether the current system still fits.
An independent report on the adequacy of the storage arrangements is often what a reviewer asks for.
A specialist-written specification gives a buying team a defensible document to issue and to assess responses against.
The engagement produces a specification and a recommendation. If the right answer is a different product, or no purchase at all, that is what the report says.
Proposals are assessed against one written specification, so quotes with different assumptions become comparable.
Running cost, utilisation, expected service life and the cost of the disruption are part of the comparison.
The output is a document for a buying team or a tender, not a set of notes from a conversation.
Access, fire, lighting, structural and continuity risks are listed so they are addressed rather than discovered.
Consulting engagements are carried out across Mumbai, Bhiwandi, Thane, Vasai-Virar, Navi Mumbai, Palghar and beyond.
Tell us about your space, your products and how you work today. If drawings exist, send those; if they do not, the site survey comes first and the plan follows it.
We discuss the business objective, the constraint and the decision that has to be made, then agree what the engagement covers.
The existing storage is examined and its performance assessed against what the business needs.
The storage requirement is written as a specification: capacity, systems, layout, safety and documentation.
Options are developed and compared on total cost and on fit against the requirement.
Where proposals have been received, they are assessed against the same specification so they can be compared fairly.
You receive a written report with the specification, the options, the risks and a clear recommendation.

Engineered for high-load industrial warehousing, our heavy-duty pallet racks provide structural stability for unitized pallet loads. Constructed with high-strength upright frames, braced channels, and adjustable box or step beams, these systems integrate seamlessly with standard timber, plastic, and steel pallets.

Conventional pallet racking system for selective pallet storage, allowing direct access to every pallet and efficient use of warehouse space with standard material-handling equipment.

Bridging the gap between light-duty slotted angle racks and heavy-duty pallet racking, long span shelving offers wide, unobstructed shelf bays for manually loaded bulky cartons, totes, and medium-weight containers.

Multiply your vertical picking space without expanding your building footprint. Our multi-tier rack systems utilize rack-supported walkways, staircases, and safety handrails to create multiple manual picking levels within high-ceiling warehouses.

Cantilever racking system for safe, organised storage of long, bulky and irregular items like pipes, sections, panels and timber, with open front access.
It is an independent assessment of a business's storage requirement: an audit of the current arrangement, a written specification of what is needed, a comparison of the options and a clear recommendation. It is delivered as advice and documentation, not as a sales approach, and it is not tied to what we manufacture.
Share any dimensions you have, item or pallet sizes, maximum loads, quantities, how often you access them, your handling equipment and any building limits. A site survey can help fill the gaps.
Because a specification written before the quotes are invited is what makes the proposals comparable, and it is the cheapest protection available against an expensive mistake. Some engagements do end with a purchase from us. Some do not, and those reports say so plainly.
Yes. We review your columns, clear height, doors, services, movement paths and current operations before proposing a layout.
Yes. We assess the drawings, the specification and the stated assumptions against your actual requirement, and we report what is sound, what is unverified and what is missing. We do not comment on a competitor's commercial terms, only on whether the technical proposal meets the requirement.
Capacity depends on item size, declared loads, system type, aisle space, handling equipment and the usable building area. We calculate it from your specific inputs.
Yes. Installation is included as part of the agreed project scope. We check site readiness before scheduling.
It depends on the size of the operation and how much data is available. An audit of a single warehouse is normally a short piece of work; a multi-site programme takes longer. The scope and schedule are agreed before the work starts.
Ideally a product and pallet list with weights, the warehouse dimensions, current pick rates and any proposals already received. Missing information is not a blocker — part of the engagement is establishing what is missing and what it would change.
Yes. The scale of the business does not determine the value of a correct specification. For a single small warehouse the engagement is simply shorter, and it may be more efficient for us to fold the consulting into a planning and supply project.
Yes. Consulting engagements are carried out across Mumbai, Vasai-Virar, Bhiwandi, Thane, Navi Mumbai, Palghar and the wider Mumbai Metropolitan Region, and for organisations elsewhere in Maharashtra and across India.
That is the intention. The specification is written to be issued so that responses are comparable, and the findings on the current arrangement are written to be usable by whoever ends up delivering the work.